To receive a quote, contact us by e-mail or phone:
Company details:
OMEP OÜ
Registration number: 16179975
VAT: EE102353082
Address:
Kopli 72e,
Tallinn, Estonia, 10412
Contact:
ISO 9001:2015
ISO 45001:2018
ISO 14001:2015
MT Arabella - Inspection - April 2024
Inspection onboard for making docking report.
Gunga - Design works - April 2024
Engineering for main deck piping systems.
Mostraum - Installation works - April - August 2024
Gunga - BWTS installation - May - June 2024
Ballast Water Treatment System (BWTS) was installed by OMEP on board the vessel Gunga. We were responsible for the prefabrication and installation of piping, as well as the installation of electrical cabinets, connections, and cable pulling during the project. The project was done in Gdansk, Poland.
Fortuna 2 - Inspection - June 2024
Inspection onboard for main deck piping repair report.
Norbris - BWTS prefabrication, installation - February - March 2023
Silver Firda - BWTS 3D, design, prefabrication, installation, sampling - March 2023
OMEP was contracted to perform a turnkey project for the installation of a Ballast Water Treatment System (BWTS) on board the vessel Silver Frida. This project consisted of all aspects of the project cycle, 3D scanning, design of all systems, prefabrication and installation of piping, as well as the installation of electrical cabinets, connections, and cable pulling, which we were responsible for during the entire project cycle. OMEP also conducted a sampling of the ballast water to ensure that the system is functioning correctly and that the samples were accurate. The project was done in Estonia.
Key Bay - Electrical inspection for BWTS - March 2023
OMEP installed electrical systems and troubleshooted them for the Ballast Water Treatment System (BWTS) on board vessel Key Bay as part of its services. This project was done during vessel operations.
Finlandia - Hydraulic works - March - April 2023
On the vessel Finlandia, OMEP assisted with the repair of hydraulic systems that were malfunctioning. There was a need to replace hydraulic components in the system, as well as do maintenance and overhaul works on the system. The work was carried out during the vessel’s operations from Finland to Estonia.
Esperansa - Supporting works - June 2023
Supporting works
Key Bay - Mechanical/electrical installations - September 2023
Additional mechanical/electrical installations onboard.
Key Fighter - BWTS prefabrication, installation - November - January 2023
Ballast Water Treatment System (BWTS) was installed by OMEP on board the vessel Key Fighter. We were responsible for the prefabrication and installation of piping, as well as the installation of electrical cabinets, connections, and cable pulling during the project. The project was done in Gdynia, Poland.
Key South - BWTS prefabrication, installation - November - February 2023
Ballast Water Treatment System (BWTS) was installed by OMEP on board the vessel Key South. We were responsible for the prefabrication and installation of piping, as well as the installation of electrical cabinets, connections, and cable pulling during the project. The project was done in Gdynia, Poland.
Atlantica Carrier - Management services - December 2023
Management services by installation of BWTS onboard.
Key Bay - BWTS Electrical Pre-Study inspection - January 2022
The OMEP carried out an inspection of the piping, internal structure, and electrical systems of the vessel Key Bay as part of the preparations for the installation of the Ballast Water Treatment System (BWTS). This was the first stage of the project. Prior to the start of the design project, specialists inspected the vessel. Project was done in Estonia.
Ocean Dee - BWTS 3D, design, prefabrication, installation - February 2022
As part of the deployment of the Ballast Water Treatment System (BWTS) on board the vessel Ocean Dee, OMEP provided a turn-key installation service. We have completed all the steps of the project. This consists of a pre-inspection, a 3D scanning process, the design of electrical and piping systems, the pre-fabrication and installation of piping, electrical works, and the full project management. This project was done in Denmark.
Key Bay - Electrical Design/Drawings - March 2022
OMEP designed the electrical system for the vessel Key Bay as the second stage of the Ballast Water Treatment System (BWTS) installation on the vessel. This project was done in Estonia.
Key Bora - Electrical Design/Drawings - March 2022
OMEP designed the electrical system for the vessel Key Bora as the second stage of the Ballast Water Treatment System (BWTS) installation on the vessel. This project was done in Estonia.
Hagland Captain - BWTS prefabrication, installation - April 2022
Hagland Captain - 10 Year Renewal - May 2022
Renewal on board the vessel Hagland Captain. This included a wide range of services as well. This task includes steel work, hydraulic maintenance, electrical work, tank cleaning, painting, machinery work, and other related tasks associated with it, etc. Service was done in Poland.
Key Fjord - BWTS prefabrication, installation - June 2022
TROSSO - Electrical works - June 2022
OMEP assisted with electrical works on board the vessel Trosso. Various electrical cabinets building and installation, cable pulling and connections. Automation works. Project was done in Sweden.
Ocean Star - 3D scaninnig - June 2022
The OMEP company carried out a full complex 3D scan for the owners of Ocean Star as well as assisted with the design work. The project was done in Norway.
Hagland Boss - BWTS prefabrication, installation - August 2022
OMEP installed the Ballast Water Treatment System (BWTS) on board vessel Hagland Boss. The work included prefabrication and installation of piping, installation of electrical cabinets, connection of cables, and cable pulling. Project was done in Poland.
Hagland Chief - Repair of bucket for crane. Welding works - August 2022
As part of its work on the vessel Hagland Chief, OMEP was responsible for repairing crane buckets and performing various welding jobs. Works were done in Poland.
Hagland Boss - 25 Year Renewal. Change of 60 ton steel - August - October 2022
On board the Hagland Boss vessel, OMEP provided a turn-key management and repair service for the renewal of the 5th (25 years) class. There was a wide range of services included in that. Work including steel fabrication and repairs, hydraulic maintenance, electrical work, tank cleaning, painting, machinery maintenance, and other tasks. Total steel replacement was 60 tons. Service was done in Poland.
Key Bora - Electrical installation works for Key Bora BWTS - November 2022
A project by OMEP was to provide electrical works for the Ballast Water Treatment System (BWTS) on board the ship Key Bora. We were responsible for pulling cables, assembling the cabinets, connecting the equipment, and installing them. The work was carried out during the operation of the vessel.
Silver Framnes - BWTS prefabrication, and installation onboard during sailing - November 2022
OMEP carried out a turn key project for Ballast Water Treatment System (BWTS) installation on board vessel Silver Framnes. The project included pre-study to determine whether the vessel is compatible with the selected BWTS plant, 3D scanning, piping and electrical design projects, as well as installation and connections for the BWTS and electrical parts. It was a project that was carried out during the operation of the vessel.
Neptune - Steel repair works onboard - December 2022
OMEP has performed various steel replacement works on board the LNG carrier Neptune as part of its maintenance program. The project was completed during a service stop in Germany.
Pearl Seaways - Electrical installation works - November-december 2022
In the course of its work on board the vessel Pearl Seaways, OMEP was responsible for the electrical works. Building and installing new electrical cabinets, as well as pulling and connecting cables. Work on automation systems. The project was carried out in Sweden.
Hagland Carrier - BWTS prefabrication, installation - August 2021
A Ballast Water Treatment System (BWTS) was installed by OMEP on board the vessel Hagland Carrier. The scope of work included prefabrication and installation of piping along with the installation of electrical cabinets, connecting and pulling cables. The project was carried out in Poland.
Arctic Lion - Management services - August 2021
In Norway, OMEP was responsible for the implementation of a large project on board Arctic Lion. During the retrofitting process, the electrical system was upgraded. Replacement of all electrical cabinets, cable pulling, and connections were carried out as part of this project. On this project OMEP provided management services as well. A few examples of this would be help with the purchase of supplies and the general management of a project.
Falkland - BWTS prefabrication, installation - August 2021
A turn-key installation of the Ballast Water Treatment System (BWTS) was carried out by OMEP on board the vessel Falkland. A significant part of the work was the installation of new piping system and electrical works. The project was done in Poland.
Norne - BWTS prefabrication, installation - October-november 2021
The Ballast Water Treatment System (BWTS) was installed by OMEP onboard the vessel Norne as a turnkey installation. It was an important part of the work to install a new piping system along with electrical work as part of this project. The project was done in Estonia.
Christina - BWTS Pre-Study inspections - December 2021
It was OMEP’s responsibility to conduct an inspection of the vessel Christina as part of the preparations for installing the Ballast Water Treatment System (BWTS). This was the first stage of the project. Before the design project began, the vessel was inspected by a team of specialists. Project was done in Finland.
Nordstraum - BWTS Pre-Study inspections - December 2021
As part of the preparations for the installation of the Ballast Water Treatment System (BWTS) on the vessel Nordstraum, OMEP carried out an inspection to make sure everything was in order. This was the first stage of the project. In order to begin the design project, specialists conducted an inspection of the vessel before starting the design work. Project was done in Finland.